Railroad Crossing Closed at Keystone Metals

This topic contains 3 replies, has 3 voices, and was last updated by  Marko82 8 mos, 3 weeks.

Viewing 4 posts - 1 through 4 (of 4 total)
 
Author Posts
Author Posts

Pierce

Private Message

Apr 2 2014 at 12:31pm #

I know a few people cross over the tracks at Keystone Metals either going into town or into the suburbs. I was annoyed to find big “road closed signs” when I got to keystone metals. You can pick your bike up and walk over the construction in process, but I imagine that might be harder to do if they’re actively moving around steel rails or concrete ties


Vannevar

Private Message

Apr 2 2014 at 7:37pm #

the other day I watched three younger riders coming inbound off the streets, approaching the trail between SC and Keystone, the front rider attempted to ride across the tracks and didn’t realize the pavement was missing between the tracks and went down pretty hard. He got up quickly and kept moving but it didn’t look like much fun. Nice guys, very courteous on the trail (when they passed me).


Pierce

Private Message

Apr 3 2014 at 11:20am #

They weren’t even working on it today (passed about an hour ago) but it’s still marked as closed. I’m not even sure what they’re doing now. It looks like there is new ballast down. Maybe they’re going to install a smoother transition from tracks to pavement? It was pretty bumpy before, like it used to be down by the Waterfront crossing


Marko82

Private Message

Apr 3 2014 at 12:59pm #

I just went through at about 12:30 and there were six or so supervisory/engineering types looking at drawings and such. No actual work crew, but I suspect it will get fixed rather quickly once they start.

Viewing 4 posts - 1 through 4 (of 4 total)
 