here's a longshot:
i think they'll develop the corridor between the railroad and keystone metals by retaining the elevated approach (right side of the pink line) to the stone abutment (left side of the pink line), then convey travelers off the abutment via a set of switchback ramps.
As I recollect from conversations of yore, setback off the active railway was an issue to overcome.